IN BRIEF - ZHENJIANG

 

  • Calcination heavy oil kiln (capacity 10,000 t)
  • Dry ball mill @ 4-5 µm
  • 12 wet ball mills (steel media 6 - 8 mm) 1,0 to 1,5 ton each; cycle 10-16 hours
  • Water decantation and vacuum suction filter
  • 72 hydraulic Chinese presses (100-120 t).
  • 9 electric pusher kilns. Manual loading & unloading. 1, 2, or 3 layers according to mix
  • grinding lines (incl. a 3 stations) single stations machine to grind any surface and any chamfers
  • ultrasonic cleaning and drying (1 line)
  • visual inspection