- Calcination heavy oil kiln (capacity 10,000 t)
- Dry ball mill @ 4-5 µm
- 12 wet ball mills (steel media 6 - 8 mm) 1,0 to 1,5 ton each; cycle 10-16 hours
- Water decantation and vacuum suction filter
-
 |
72 hydraulic Chinese presses (100-120 t). |
- 9 electric pusher kilns. Manual loading & unloading. 1, 2, or 3 layers according to mix
- grinding lines (incl. a 3 stations) single stations machine to grind any surface and any chamfers
- ultrasonic cleaning and drying (1 line)
- visual inspection
|